The building drawing of any structure is explained by a bunch of associated drawings that give the Builder a complete graphic description of each phase of the construction process. In some cases, a bunch of drawings starts by showing the path, boundaries, contours, & outstanding physical features of the construction site and its neighbor areas. Succeeding drawings give instructions for the excavation and disposition of existing ground; construction of the foundations and superstructure; installation of utilities, & whatever else is needed to complete the house design structure.
What is Construction Drawing?
Construction drawings are sometimes referred to as working drawings or building drawings. They are used by all involved in a project to work on the actual building of the design. The main purpose of construction drawings (also called building plans, blueprints, or working drawings) is to show what is to be built, while the specifications focus on the materials, installation techniques, and quality standards. Most of the designers put their basic construction information in the drawings and use the spectacles to complex materials, techniques, & standards to be met. Others pack their drawings with written notes that cover many of the problems are frequently contained in the spectacles. In some situations, you’ll find the same information in both places. If there is a spectacle between the specs and drawing, the spectacles generally override the plans, at least legally.
RCC drawing shows the layout of steel reinforcing bars in the concrete namely column center line, footing layout, footing schedule, Typical beam framing layout, Plinth beam layout, Slab layout, Slab schedules column schedule, typical Staircase drawings. They outline the size and types of materials to be used, as well as the general demands for connections.
These drawings communicate the house plan design of buildings structure to building authority to review. They also become part of the contract documents which guide contractors in detailing, fabricating and installing parts of structure.
These drawings plays crucial role in the success of any structural construction and bidding process It provides a platform for planning and estimating cost for each phase of construction.
The structural drafter is responsible for producing working drawings that clearly describes the schedule and material involved for each phase of construction.
To generate accurate construction drawings the drafter must have thorough domain expertise knowledge of local building codes and relevant industry experience.
- Introduction of Drawings
->Architectural plan given by Architect
->Schematic layout given by structure engineer. - Autocad Commands
- Column Placement drawing
- Center line drawing
- Footing layout drawing
- Footing schedule drawing
- Column schedule drawing
- Plinth beam layout drawing
- Floor beam layout drawing
- Longitudinal sections drawing
- Slab layout drawing
- Staircase layout drawing
Why to choose Omegacad
Online & Offline Classes
Training by Industry Experts
Updated Course Materials
Weekly Test
Certification after Course Completion
100% Placement Assistance
Private and Group Sessions
Placement Training
I took ETABS/STRAP/STADPRO courses in OMEGACADD. Where I learned Static and Dynamic Analysis of building (RCC). I already learned all those things
lokesh kumar
Presently I am working in as reputed structure consultants in Delhi as a Structure Engineer. I gained skills of analysis and design
Karthikeya Jashwanth
I took the STADPRO/RCC Detailing /Quantity surveying courses in OMEGACADD. Comparing to other institute here we are discussing about live project problems
Aman Syed
Tags
Construction Drawings Training in Ameerpet, Hyderabad.
Construction Drawings Institute in Ameerpet, Hyderabad.
Construction Drawings Course Training in Ameerpet, Hyderabad
Training Institute for Construction Drawings in Ameerpet, Hyderabad